There are 2 input parameters:

  1. AtrMultiplier: The lines will have this* the current Atr value distance from the moving averages.
  2. Period: High and Low moving average, Atr period.

The basic idea is to have 6 lines: upper will be 2*atrmultiplier*atr +HighMA, second then atrmultiplier*atr + HighMA... Very easy to understand,